„Entafarma“ Pharmaceutical Warehouse & Administration Building

General contractor “Conresta” has been entrusted with a 15,000 sq. m. pharmaceutical storage project. The client “Entafarma” owns the largest and most modern pharmaceutical logistics and warehousing facilities in the Baltic States.

Finished
General contractor

JSC "Conresta"

Client

JSC „Klonėnų NT“

Country

Lithuania

01

Construction start:

2016 03

02

Area:

15 000 m2

03

Number of pallets contains:

10 000

The air temperature in the premises is constantly being monitored, storage facilities for narcotic and psychotropic drugs, as well as cold-kept-drugs were installed. The warehouse provides up to 10,000 pallet spots.

The one-storey building is mostly occupied by a warehouse with 5.5-meter-high racks. Service gate groups are designed on the southern side of the wall, with loading, unloading and sorting areas adjacent to them. The front of the building has administrative and household premises for employees. The car parking lot has 158 parking spaces, 7 of which are for people with disabilities, and a bicycle parking area with bike racks. There is an automatic gate at the north entrance, and automatic lifting barriers for heavy vehicles on the south side. The construction of the building was carried out in four stages.

Other projects

Finished

Modernisation of the Medininkai Border Crossing Point

Finished

Automated Lithuanian Post Logistics Center

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

“Litgrid” system control and data center

Finished

Automated “Continental Automotive” factory in the FEZ of Kaunas

Finished

“Creolink” Warehouse With Administrative Premises

Finished

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ogisanda” Warehouse & Administration Building

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“Brenntag Lithuania” Warehouse & Administration Building

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Alviva“ Sewing Factory

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Extension of “WOOD LINE” Warehouse

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory