fr lt en

“Brenntag Lithuania” Warehouse & Administration Building

“Conresta” has been entrusted with the building of a wholesale warehouse project. It includes a packing post, a ramp and a tanker truck loading-unloading station. The total area of the building is 1560.74 sq. meters.

Finished
General contractor

JSC "Conresta"

Client

JSC „Brenntag Lietuva“

Country

Lithuania

Architect / Designer

JSC "Sweco"

01

Construction start:

2015 10

02

Construction period:

9 mmonths

03

Project area:

1 560 m2

The object is designed for the discharge of liquid chemicals from road tankers, as well as for filling them up with prepared liquid chemicals. Warehouses store pre-packed products such as alkalis, neutral liquids and solids, acid, diluents. The building is equipped with dosimeters, which measure the level of harmful substances in the air. The building consists of reinforced concrete columns, metal trusses and drop-down-structures. Project address: Palemono str. 171 D, Kaunas.

04

Building height:

11 m

05

Number of floors:

4

06

Purpose

Specialized

Other projects

Finished

Modernisation of the Medininkai Border Crossing Point

Finished

Automated Lithuanian Post Logistics Center

Finished

“Vilniaus Baldai” Factory in Trakai District (Value – 50 Million Euros)

Finished

“Litgrid” system control and data center

Finished

Automated “Continental Automotive” factory in the FEZ of Kaunas

Finished

“Creolink” Warehouse With Administrative Premises

Finished

The Construction of 2 Modules of “Hegelmann Transporte” Logistics Complex

Finished

A Modern Food Production Manufactory of “Vilnius Poultry Farm” in Rudamina

Finished

“Ogisanda” Warehouse & Administration Building

Finished

“Ikarai” Liquid Fertilizer Plant, Kėdainiai FEZ

Finished

“Hansa Flex Hidraulika” Administrative, Industrial & Warehouse Building

Finished

Class A Logistics Center of „Liepkalnis Industrial Park”

Finished

“Kaišiadorys Poultry Farm” Bird Breeding Complex

Finished

Fire and Rescue Training Center

Finished

“ABB” High Voltage Switchgear in Alytus

Finished

„Alviva“ Sewing Factory

Finished

„Entafarma“ Pharmaceutical Warehouse & Administration Building

Finished

“Grainmore” Automated Probiotic Processing Plant & Laboratory

Finished

The Reconstruction of Industrial Sewing Building “Lelija”

Finished

“Schmitz Cargobull Baltic” Production Building

Finished

Eišiškės Border Control Point

Finished

The Extension of “WOOD LINE” Warehouse

Finished

The Reconstruction of “Galinta & CO” Production Lines

Finished

Fire and Rescue Department

Finished

“Airo Catering Services Lietuva” Cooking Manufactory